Pipeline Integrity Project: Line 8109 – Cuyama, CA

This project was constructed as a part of the general So Cal Gas Pipeline Integrity Program to provide vital pipeline testing and inspection infrastructure. Lyles Utility Construction provided all manpower and equipment on this project and provided all manpower and equipment to fabricate, install and test high pressure “smart pig” facilities at two locations along existing Line 8109. Under this contract, Lyles Utility Construction constructed a 20” launching facility at the Cuyama Station and a 20” receiving station at the Apache Valve Station located 18 miles to the southwest.